lab_meetings
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| lab_meetings [2024-07-08 11:53 am] – hcho | lab_meetings [2024-08-03 10:21 pm] (current) – ↷ Links adapted because of a move operation hcho | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| - | ====== Lab meetings ====== | + | [[lab_only:lab_meetings:]] |
| - | + | ||
| - | ===== Someday ===== | + | |
| - | + | ||
| - | Cho's goals | + | |
| - | * ROSES | + | |
| - | * Work with the research office to improve the proposal | + | |
| - | * ERDC | + | |
| - | * Start a pre-proposal | + | |
| - | * SWE | + | |
| - | * Literature review | + | |
| - | * AGU abstracts | + | |
| - | * POSE | + | |
| - | * SWE | + | |
| - | * Dr. Srini for SWAT | + | |
| - | * POSE GRASS workshop | + | |
| - | * Asad | + | |
| - | * Revisit the culvert capacity discussion | + | |
| - | * NMCAMP weekly maps | + | |
| - | + | ||
| - | ===== 2024-07-08 ===== | + | |
| - | + | ||
| - | Asad | + | |
| - | * CAMP | + | |
| - | * Culvert ID script | + | |
| - | * Sent to NMDOT | + | |
| - | * Waiting for their response about AGOL profiles | + | |
| - | * Frequency analysis | + | |
| - | * PeakFQ (10 hours) | + | |
| - | * Calculate the culvert capacity (10 hours): | + | |
| - | * [[https:// | + | |
| - | * DL-FIM (0 hours) [[https:// | + | |
| - | * Publication => Thesis | + | |
| - | * Important | + | |
| - | * AGU abstract | + | |
| - | * Data: [[https:// | + | |
| - | + | ||
| - | Abdullah | + | |
| - | * WRRA | + | |
| - | * Scripting for weather forcing is complete | + | |
| - | * Started on Friday 7/5: Precipitation, | + | |
| - | * Completed | + | |
| - | * Soil | + | |
| - | * LAI | + | |
| - | * TODOs | + | |
| - | * Global parameters (10 hours) | + | |
| - | * Working | + | |
| - | * Elevation in soil: Aggregate USGS 10m DEM and replace the elev column in the soil input file (10 hours) | + | |
| - | * DISES | + | |
| - | * Field trip (20 hours) | + | |
| - | * Write down your questions for modeling | + | |
| - | * Ask very specific questions about data | + | |
| - | * Questions for stakeholders | + | |
| - | * Water supply sources for El Rito | + | |
| - | * Any water diversions in El Rito | + | |
| - | * Completed on Overleaf | + | |
| - | * Issue documentation | + | |
| - | * How to reproduce everything | + | |
| - | * HEC-RAS 2D floodway (wants to publish it ASAP) | + | |
| - | * Chattahoochee model, but we changed the study site to Ruidoso, NM | + | |
| - | * Ruidoso | + | |
| - | * Hourly precipitation data for rain-on-grid modeling | + | |
| - | * If not possible, we'll use hourly hydrograph for the downstream of the USGS gage | + | |
| - | * Basic model ready | + | |
| - | * 1m DEM | + | |
| - | * Chattahoochee River (250m-long river section) | + | |
| - | * TODOs | + | |
| - | * Encroachment | + | |
| - | * Hydrograph | + | |
| - | * Study rhdf5 (R library) | + | |
| - | * Working | + | |
| - | * AGU abstract | + | |
| - | + | ||
| - | ===== 2024-06-24 ===== | + | |
| - | + | ||
| - | Mahesh | + | |
| - | * SWE | + | |
| - | * Complete the training (8 hours spent) | + | |
| - | * Literature review & summary (0 hours spent) | + | |
| - | * NSE (12 hours spent, 8 hours) | + | |
| - | * Forecasting for the proposal (12 hours, plan to finish it by Wednesday) | + | |
| - | * Expected output: A text file with observed and predicted SWE time series | + | |
| - | + | ||
| - | Asad | + | |
| - | * CAMP | + | |
| - | * Regression raster calculations (5 hours spent) | + | |
| - | * Done in GRASS GIS | + | |
| - | * Documentation (0 hours spent, 4 hours) | + | |
| - | * Spent time on publication (NO! NMDOT doesn' | + | |
| - | * This time is for the [[https:// | + | |
| - | * Frequency analysis (8 hours) | + | |
| - | * Calculate the culvert capacity (0 hours spent waiting for q*.tif, 8 hours): [[https:// | + | |
| - | * DL-FIM (0 hours) [[https:// | + | |
| - | * Publication => Thesis | + | |
| - | * Important | + | |
| - | * AGU abstract | + | |
| - | + | ||
| - | Abdullah | + | |
| - | * WRRA | + | |
| - | * Prepare VIC inputs (30 hours) | + | |
| - | * Completed | + | |
| - | * Soil | + | |
| - | * LAI | + | |
| - | * Working and TODOs | + | |
| - | * Weather forcing | + | |
| - | * Global parameters | + | |
| - | * Elevation in soil: Aggregate USGS 10m DEM and replace the elev column in the soil input file | + | |
| - | * Literature review for the proposal (0 hours) | + | |
| - | * 2-3 hours last week | + | |
| - | * DISES: Documentation (10 hours) | + | |
| - | * On Overleaf | + | |
| - | * Last week's work | + | |
| - | * Issue documentation | + | |
| - | * How to reproduce everything | + | |
| - | * HEC-RAS 2D floodway (wants to publish it this year) | + | |
| - | * Basic model ready | + | |
| - | * 1m DEM | + | |
| - | * Chattahoochee River (250m-long river section) | + | |
| - | * TODOs | + | |
| - | * Encroachment | + | |
| - | * Hydrograph | + | |
| - | * Study rhdf5 (R library) | + | |
| - | * AGU abstract | + | |
| - | + | ||
| - | ===== 2024-06-17 ===== | + | |
| - | + | ||
| - | Cho's goals | + | |
| - | * NSF ROSES | + | |
| - | * Complete section 3a | + | |
| - | * ERDC | + | |
| - | * Select an appropriate program | + | |
| - | * Start a literature review | + | |
| - | * POSE | + | |
| - | * macOS CMake | + | |
| - | + | ||
| - | Abdullah' | + | |
| - | * WRRA | + | |
| - | * Prepare VIC inputs (25 hours) | + | |
| - | * Literature review for the proposal (5 hours) | + | |
| - | * DISES: Documentation (10 hours) | + | |
| - | * HEC-RAS 2D floodway (wants to publish it this year) | + | |
| - | - Identify the study area and resolution | + | |
| - | - Make a HEC-RAS 2D model | + | |
| - | + | ||
| - | Asad's goals | + | |
| - | * CAMP | + | |
| - | * Complete the regression raster calculations (2 hours) | + | |
| - | * Documentation (10 hours) | + | |
| - | * Calculate the culvert capacity (8 hours) | + | |
| - | * Publication => Thesis | + | |
| - | * Important | + | |
| - | + | ||
| - | Mahesh' | + | |
| - | * SWE | + | |
| - | * Complete the training (5 hours) | + | |
| - | * Literature review & summary (15 hours) | + | |
lab_meetings.1720461211.txt.gz · Last modified: by hcho
