lab_meetings
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
lab_meetings [2024-06-24 11:29 am] – hcho | lab_meetings [2024-08-03 10:21 pm] (current) – ↷ Links adapted because of a move operation hcho | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== Lab meetings ====== | + | [[lab_only:lab_meetings:]] |
- | + | ||
- | ===== Someday ===== | + | |
- | + | ||
- | Cho's goals | + | |
- | * ROSES | + | |
- | * Work with the research office to improve the proposal | + | |
- | * ERDC | + | |
- | * Start a pre-proposal | + | |
- | * SWE | + | |
- | * Literature review | + | |
- | * AGU abstracts | + | |
- | * POSE | + | |
- | * SWE | + | |
- | * Dr. Srini for SWAT | + | |
- | * Asad | + | |
- | * Revisit the culvert capacity discussion | + | |
- | * NMCAMP weekly maps | + | |
- | + | ||
- | ===== 2024-06-24 ===== | + | |
- | + | ||
- | Mahesh | + | |
- | * SWE | + | |
- | * Complete the training (8 hours spent) | + | |
- | * Literature review & summary (0 hours spent) | + | |
- | * NSE (12 hours spent, 8 hours) | + | |
- | * Forecasting for the proposal (12 hours, plan to finish it by Wednesday) | + | |
- | * Expected output: A text file with observed and predicted SWE time series | + | |
- | + | ||
- | Asad | + | |
- | * CAMP | + | |
- | * Regression raster calculations (5 hours spent) | + | |
- | * Done in GRASS GIS | + | |
- | * Documentation (0 hours spent, 4 hours) | + | |
- | * Spent time on publication (NO! NMDOT doesn' | + | |
- | * This time is for the [[https:// | + | |
- | * Frequency analysis (8 hours) | + | |
- | * Calculate the culvert capacity (0 hours spent waiting for q*.tif, 8 hours) | + | |
- | * DL-FIM (0 hours) | + | |
- | * Publication => Thesis | + | |
- | * Important | + | |
- | * AGU abstract | + | |
- | + | ||
- | Abdullah | + | |
- | * WRRA | + | |
- | * Prepare VIC inputs (30 hours) | + | |
- | * Completed | + | |
- | * Soil | + | |
- | * LAI | + | |
- | * Working and TODOs | + | |
- | * Weather forcing | + | |
- | * Global parameters | + | |
- | * Elevation in soil: Aggregate USGS 10m DEM and replace the elev column in the soil input file | + | |
- | * Literature review for the proposal (0 hours) | + | |
- | * 2-3 hours last week | + | |
- | * DISES: Documentation (10 hours) | + | |
- | * On Overleaf | + | |
- | * Last week's work | + | |
- | * Issue documentation | + | |
- | * How to reproduce everything | + | |
- | * HEC-RAS 2D floodway (wants to publish it this year) | + | |
- | * Basic model ready | + | |
- | * 1m DEM | + | |
- | * Chattahoochee River (250m-long river section) | + | |
- | * TODOs | + | |
- | * Encroachment | + | |
- | * Hydrograph | + | |
- | * Study rhdf5 (R library) | + | |
- | * AGU abstract | + | |
- | + | ||
- | ===== 2024-06-17 ===== | + | |
- | + | ||
- | Cho's goals | + | |
- | * NSF ROSES | + | |
- | * Complete section 3a | + | |
- | * ERDC | + | |
- | * Select an appropriate program | + | |
- | * Start a literature review | + | |
- | * POSE | + | |
- | * macOS CMake | + | |
- | + | ||
- | Abdullah' | + | |
- | * WRRA | + | |
- | * Prepare VIC inputs (25 hours) | + | |
- | * Literature review for the proposal (5 hours) | + | |
- | * DISES: Documentation (10 hours) | + | |
- | * HEC-RAS 2D floodway (wants to publish it this year) | + | |
- | - Identify the study area and resolution | + | |
- | - Make a HEC-RAS 2D model | + | |
- | + | ||
- | Asad's goals | + | |
- | * CAMP | + | |
- | * Complete the regression raster calculations (2 hours) | + | |
- | * Documentation (10 hours) | + | |
- | * Calculate the culvert capacity (8 hours) | + | |
- | * Publication => Thesis | + | |
- | * Important | + | |
- | + | ||
- | Mahesh' | + | |
- | * SWE | + | |
- | * Complete the training (5 hours) | + | |
- | * Literature review & summary (15 hours) | + |
lab_meetings.1719250198.txt.gz · Last modified: by hcho